Quote Originally Posted by Tim Kurcz View Post
Basically, that's what is planned for the 888. A prototype will be built welding a "blade" to the existing Mercury rod cap. The matching "fork" will be machined into a custom link rod. These will be constructed to complete swing testing and clearancing of the opposing block.
Merry Christmas Tim
how hard is it to make a rod for an outboard?
I have never seen the process?
Thinking of the 8 rare rods in my v8